N2 - Environmental impact assessment (EIA) studies are standard practice and a regulatory requirement for most new desalination projects today. However, most of the EIA studies are limited to predictive information; that is, they gather information on the project and the project's environment before project implementation to make predictions about likely impacts. The EIAs may involve comprehensive studies, such as field monitoring, laboratory toxicity testing, and modeling studies. Consequently, the"surprising paucity of useful experimental data, either from laboratory tests or from field monitoring studies", which was observed by the US National Research Council in 2008, has been gradually decreasing. However, there is still a long-term research need on the site-specific effects of desalination plants after project commissioning has taken place. A main challenge of field research is the adequate design of the monitoring studies, which have to adequately distinguish the effects of the desalination project from natural processes over long periods of time. The existing monitoring studies have so far used a wide range of approaches and methods to investigate the environmental impacts of desalination plant discharges. Shortfalls are often that they are limited in scope, short-term, or localized. In essence, many studies fall short of recognizing the potentially synergetic effects of the single waste components of the discharges on marine organisms and the complexity of the potential responses by the ecosystem. While the possible risk of damage arising from the concentrate discharge to the marine environment in close proximity to the outfall is at hand, no conclusive evidence can yet be provided concerning the long-term impacts of desalination plant discharges, let alone the cumulative impacts on certain sea areas. This paper conducts a critical review of existing monitoring programs for desalination plants. Shortcomings of current practices are identified and relevant aspects to the design of marine monitoring programs outlined, including the scope of the studies as well as their scientific requirements. © 2013 Desalination Publications.
AB - Environmental impact assessment (EIA) studies are standard practice and a regulatory requirement for most new desalination projects today. However, most of the EIA studies are limited to predictive information; that is, they gather information on the project and the project's environment before project implementation to make predictions about likely impacts. The EIAs may involve comprehensive studies, such as field monitoring, laboratory toxicity testing, and modeling studies. Consequently, the"surprising paucity of useful experimental data, either from laboratory tests or from field monitoring studies", which was observed by the US National Research Council in 2008, has been gradually decreasing. However, there is still a long-term research need on the site-specific effects of desalination plants after project commissioning has taken place. A main challenge of field research is the adequate design of the monitoring studies, which have to adequately distinguish the effects of the desalination project from natural processes over long periods of time. The existing monitoring studies have so far used a wide range of approaches and methods to investigate the environmental impacts of desalination plant discharges. Shortfalls are often that they are limited in scope, short-term, or localized. In essence, many studies fall short of recognizing the potentially synergetic effects of the single waste components of the discharges on marine organisms and the complexity of the potential responses by the ecosystem. While the possible risk of damage arising from the concentrate discharge to the marine environment in close proximity to the outfall is at hand, no conclusive evidence can yet be provided concerning the long-term impacts of desalination plant discharges, let alone the cumulative impacts on certain sea areas. This paper conducts a critical review of existing monitoring programs for desalination plants. Shortcomings of current practices are identified and relevant aspects to the design of marine monitoring programs outlined, including the scope of the studies as well as their scientific requirements. © 2013 Desalination Publications.
UR - http://hdl.handle.net/10754/565993
UR - https://www.tandfonline.com/doi/full/10.1080/19443994.2012.694214
UR - http://www.scopus.com/inward/record.url?scp=84875798835&partnerID=8YFLogxK
U2 - 10.1080/19443994.2012.694214
DO - 10.1080/19443994.2012.694214
M3 - Article
SN - 1944-3994
VL - 51
SP - 233
EP - 245
JO - Desalination and Water Treatment
JF - Desalination and Water Treatment
IS - 1-3
ER -