Abstract
By applying the multi-Hubbert curve analysis to coal production in the United States, we demonstrate that anthracite production can be modeled with a single Hubbert curve that extends to the practical end of commercial production of this highest-rank coal. The production of bituminous coal from existing mines is about 80% complete and can be carried out at the current rate for the next 20 years. The production of subbituminous coal from existing mines can be carried out at the current rate for 40-45 years. Significant new investment to extend the existing mines and build new ones would have to commence in 2009 to sustain the current rate of coal production, 1 billion tons per year, in 2029. In view of the existing data, we conclude that there is no spare coal production capacity of the size required for massive coal conversion to liquid transportation fuels. Our analysis is independent of other factors that will prevent large-scale coal liquefaction projects: the inefficiency of the process and either emissions of greenhouse gases or energy cost of sequestration.
Original language | English (US) |
---|---|
Pages (from-to) | 173-180 |
Number of pages | 8 |
Journal | Natural Resources Research |
Volume | 18 |
Issue number | 3 |
DOIs | |
State | Published - Jul 2009 |
Externally published | Yes |
Keywords
- Coal ranks
- History
- Hubbert curve
- Production
- Reserves
ASJC Scopus subject areas
- General Environmental Science